What county-wide Navien installation includes
The scope does not change when we cross a city line, but the paperwork and the field conditions do. Every install we hand over is permitted in the jurisdiction it sits in and verified before we leave.
- Gas load calculation and line resizing for the unit's full firing rate
- Sealed-combustion venting routed and terminated to Navien and code clearances
- Condensate drain with neutralizer, required on every condensing NPE and NCB
- Isolation service valves so future descaling never requires cutting pipe
- Permit pulled with the correct authority — San Jose, Santa Clara, Sunnyvale, Cupertino, Milpitas, Campbell, Los Gatos, Saratoga, Mountain View, Los Altos, Morgan Hill, or Gilroy
- Combustion analysis, temperature calibration, and Navien warranty registration in your name


